Travel Bali to Nusa Penida

Bali to Nusa Penida

Arrive in Nusa Penida’s rugged cliffs and crystal waters, a contrast to Bali’s lush rice terraces and temples. This route links Bali and Nusa Penida using combined or ferry, making it easy to check schedules and prices before you travel.

Travel options for Bali to Nusa Penida

Starting at Bali, travel affordably by a ferry for 47196 IDR, and reach Nusa Penida faster by combined in 20 minutes.

Ferry from Bali to Nusa Penida

Catch a ferry departing from multiple stations, including Sanur Harbour, Sanur Idola Express, Sanur Tanis, Sanur Harbor and others to travel from Bali toward Nusa Penida. The crossing usually takes around 25 minutes, and tickets generally start at 47,196 IDR, depending on the service and season. The ferry arrives at multiple stations, including Nusa Penida, Banjar Nyuh Idola, Nusa Penida, Nusa Penida Tanis, Banjar Nyuh, Nusa Penida and others, allowing you to continue your journey smoothly. You can review routes and ticket options through the ferry listings.

Prices: 47,196 IDR

Duration: 25m – 2h ⏱

Ride with ferry from Bali to Nusa Penida in 0h 25m Go with ferry from Bali to Nusa Penida in 0h 25m Go with ferry from Bali to Nusa Penida for 47196 IDR Experience ferry from Bali to Nusa Penida in 0h 25m Go with ferry from Bali to Nusa Penida in 0h 25m Book ferry from Bali to Nusa Penida in 0h 25m

View all Ferry tickets →

Combined from Bali to Nusa Penida

Combined services connect Bali and Nusa Penida, departing from multiple stations, including Puja Mandala, Nusa Dua, Nirmala Supermarket Ungasan, Bali, Legian Transfer, Bali, Central Ubud Transfer and others and arriving at multiple stations, including Banjar Nyuh Pier, Nusa Penida, Nusa Penida, Banjar Nyuh Harbour, Nusa Penida, Nusa Penida Rayfish and others. Expect a journey of about 20 minutes, with tickets priced at 160,000 IDR. Check available options and secure your seat reserve now.

Prices: 160,000 IDR

Duration: 20m – 6h ⏱

Go with combined from Bali to Nusa Penida in 0h 20m Choose combined from Bali to Nusa Penida for 160000 IDR Ride with combined from Bali to Nusa Penida for 160000 IDR Go with combined from Bali to Nusa Penida for 160000 IDR Ride with combined from Bali to Nusa Penida in 0h 20m Go with combined from Bali to Nusa Penida for 160000 IDR

View all Combined tickets →

Distance Bali to Nusa Penida

The distance between Bali and Nusa Penida is 68.9 kilometers.

Bali to Nusa Penida Transportation Comparison

Compare transport options side by side using key travel metrics to find the best way to get from Bali to Nusa Penida

Ferry
Combined
Average price
156,412 IDR
391,074 IDR
Cheapest price
47,196 IDR
160,000 IDR
Average duration
0h 39m
2h 36m
Minimum duration
0h 25m
0h 20m
Number of departures
124
539
Tickets

Ferry Routes & Schedules from Bali to Nusa Penida

On the Bali to Nusa Penida ferry route, travelers can board and disembark at several docks. Departures run from 06:30 until 17:00, and the journey usually lasts about 1h to 2h. Ticket prices start at 47,196 to 307,800 IDR and may differ depending on the terminal. Checking the full ferry timetable for Bali and Nusa Penida allows you to plan your crossings and pick the departure that works best.

Departure stations
Sanur Harbour
Sanur Idola Express
Sanur Tanis
Sanur Harbor
Sanur Sanjaya
Sanur Semabu Hills
Sanur Caspla
Sanur Wijaya Buyuk
Pelabuhan Tribuana Kusamba, Bali
Sanur Beach Port
Sanur Arjuna
Sanur Port
Kusamba Port
Serangan Pier, Bali
Sanur Axe Stone
Sanur Rayfish
Sanur SGening
Waruna Darma Sanur Office
Marina Office Serangan, Sanur
Sanur El Rey
Serangan Eka Jaya, Bali
Padang Bai Ferry Terminal, Bali
Padang Bai Eka Jaya, Bali
Sanur Angel Billabong
Sanur Beach Port Angkal
Sanur Beach Maruti
Arrival stations
Nusa Penida
Banjar Nyuh Idola, Nusa Penida
Nusa Penida Tanis
Banjar Nyuh, Nusa Penida
Banjar Nyuh Harbour, Nusa Penida
Nusa Penida Pier
Nusa Penida Semabu Hills
Nusa Penida Caspla
Buyuk Harbor, Nusa Penida
Sampalan Port, Nusa Penida
Maruti Port, Nusa Penida
Nusa Penida Arjuna
Kutampi Beach, Nusa Penida
Axe Stone Fast Cruise, Nusa Penida
Nusa Penida Rayfish
Waruna Darma Nusa Penida Office
Marina Group Fast Ferry Nusa Penida
Nusa Penida El Rey
Banjar Nyuh Pier, Nusa Penida
Nusa Penida Pelabuhan Penyeberangan Slow Boat

Ferry Timetable: Kusamba Port → Sampalan Port, Nusa Penida

  • 06:30 07:55 25m 151700 IDR
  • 07:00 08:25 25m 151700 IDR
  • 08:00 09:25 25m 151700 IDR
  • 09:30 10:55 25m 151700 IDR
  • 10:30 11:55 25m 151700 IDR
  • 11:45 13:10 25m 151700 IDR
  • 13:45 15:10 25m 151700 IDR
  • 16:00 17:25 25m 151700 IDR
  • 17:00 18:25 25m 151700 IDR

Ferry Timetable: Marina Office Serangan, Sanur → Marina Group Fast Ferry Nusa Penida

  • 13:30 14:30 1h 150000 IDR

Ferry Timetable: Padang Bai Eka Jaya, Bali → Nusa Penida

  • 11:00 12:00 1h 307800 IDR

Ferry Timetable: Padang Bai Ferry Terminal, Bali → Nusa Penida Pelabuhan Penyeberangan Slow Boat

  • 09:00 11:00 2h 47196 IDR
  • 14:30 16:30 2h 47196 IDR

Ferry Timetable: Pelabuhan Tribuana Kusamba, Bali → Sampalan Port, Nusa Penida

  • 06:30 07:00 30m 153050 IDR
  • 07:00 07:30 30m 153050 IDR
  • 08:00 08:30 30m 153050 IDR
  • 09:00 09:30 30m 153050 IDR
  • 10:30 11:00 30m 153050 IDR
  • 12:30 13:00 30m 153050 IDR
  • 14:00 14:30 30m 153050 IDR
  • 15:45 16:15 30m 153050 IDR
  • 17:00 17:30 30m 153050 IDR

Ferry Timetable: Sanur Angel Billabong → Banjar Nyuh Harbour, Nusa Penida

  • 07:30 08:15 45m 149843 IDR
  • 08:30 09:15 45m 149843 IDR
  • 10:00 10:45 45m 149843 IDR
  • 14:15 15:00 45m 149843 IDR
  • 17:00 17:45 45m 149843 IDR

Ferry Timetable: Sanur Arjuna → Nusa Penida Arjuna

  • 07:30 08:10 40m 153750 IDR
  • 08:00 08:40 40m 153750 IDR
  • 09:00 09:40 40m 153750 IDR
  • 11:00 11:40 40m 153750 IDR
  • 13:00 13:40 40m 153750 IDR

Ferry Timetable: Sanur Axe Stone → Axe Stone Fast Cruise, Nusa Penida

  • 07:00 07:30 30m 153750 IDR
  • 07:30 08:00 30m 153750 IDR
  • 08:00 08:30 30m 153750 IDR
  • 08:30 09:00 30m 153750 IDR
  • 09:00 09:30 30m 153750 IDR
  • 11:00 11:30 30m 153750 IDR
  • 15:30 16:00 30m 153750 IDR

Ferry Timetable: Sanur Beach Maruti → Maruti Port, Nusa Penida

  • 07:30 08:15 45m 150000 IDR
  • 08:00 08:45 45m 150000 IDR
  • 08:30 09:15 45m 150000 IDR
  • 09:00 09:45 45m 150000 IDR
  • 13:00 13:45 45m 150000 IDR
  • 15:00 15:45 45m 150000 IDR

Ferry Timetable: Sanur Beach Port → Buyuk Harbor, Nusa Penida

  • 08:00 08:30 30m 192050 IDR
  • 12:30 13:00 30m 192050 IDR

Ferry Timetable: Sanur Beach Port Angkal → Nusa Penida

  • 07:00 07:45 45m 151700 IDR
  • 07:30 08:15 45m 151700 IDR
  • 08:00 08:45 45m 151700 IDR
  • 08:30 09:15 45m 151700 IDR
  • 09:00 09:45 45m 151700 IDR
  • 10:30 11:15 45m 151700 IDR
  • 13:00 13:45 45m 151700 IDR
  • 15:30 16:15 45m 151700 IDR

Ferry Timetable: Sanur Caspla → Nusa Penida Caspla

  • 08:00 08:40 40m 152500 IDR

Ferry Timetable: Sanur El Rey → Nusa Penida El Rey

  • 08:15 08:45 30m 142500 IDR
  • 11:45 12:15 30m 142500 IDR

Ferry Timetable: Sanur Harbor → Banjar Nyuh, Nusa Penida

  • 08:30 09:15 45m 150000 IDR

Ferry Timetable: Sanur Harbor → Maruti Port, Nusa Penida

  • 09:00 09:45 45m 143138 IDR

Ferry Timetable: Sanur Harbour → Nusa Penida

  • 07:00 07:45 45m 180000 IDR
  • 07:30 08:15 45m 180000 IDR
  • 08:00 08:45 45m 180000 IDR
  • 08:30 09:15 45m 180000 IDR
  • 09:00 09:45 45m 180000 IDR
  • 10:00 10:45 45m 180000 IDR
  • 10:30 11:15 45m 180000 IDR
  • 11:00 11:45 45m 180000 IDR
  • 11:50 12:35 45m 180000 IDR
  • 13:00 13:45 45m 180000 IDR
  • 13:30 14:15 45m 180000 IDR
  • 14:15 15:00 45m 180000 IDR
  • 15:00 15:45 45m 180000 IDR
  • 15:30 16:15 45m 180000 IDR
  • 17:00 17:45 45m 180000 IDR

Ferry Timetable: Sanur Harbour → Nusa Penida Pier

  • 08:30 09:15 45m 153000 IDR

Ferry Timetable: Sanur Idola Express → Banjar Nyuh Idola, Nusa Penida

  • 08:30 09:30 1h 153500 IDR
  • 10:30 11:30 1h 153500 IDR
  • 11:50 12:50 1h 153500 IDR
  • 14:00 15:00 1h 153500 IDR

Ferry Timetable: Sanur Port → Nusa Penida

  • 07:30 08:15 45m 150000 IDR
  • 08:00 08:45 45m 150000 IDR
  • 08:45 09:30 45m 175440 IDR
  • 09:00 09:45 45m 150000 IDR
  • 12:00 12:45 45m 150000 IDR
  • 13:30 14:15 45m 150000 IDR

Ferry Timetable: Sanur Rayfish → Nusa Penida Rayfish

  • 08:30 09:00 30m 135000 IDR

Ferry Timetable: Sanur Sanjaya → Banjar Nyuh Harbour, Nusa Penida

  • 07:30 08:00 30m 165000 IDR
  • 08:30 09:00 30m 165000 IDR

Ferry Timetable: Sanur Semabu Hills → Banjar Nyuh Pier, Nusa Penida

  • 06:30 07:00 30m 107100 IDR
  • 07:00 07:30 30m 107100 IDR
  • 07:30 08:00 30m 107100 IDR
  • 08:00 08:30 30m 107100 IDR
  • 08:30 09:00 30m 107100 IDR
  • 09:00 09:30 30m 107100 IDR
  • 13:00 13:30 30m 107100 IDR
  • 15:00 15:30 30m 107100 IDR

Ferry Timetable: Sanur Semabu Hills → Nusa Penida Semabu Hills

  • 06:30 07:00 30m 153000 IDR
  • 07:00 07:30 30m 153000 IDR
  • 07:30 08:00 30m 153000 IDR
  • 08:00 08:30 30m 153000 IDR
  • 08:30 09:00 30m 153000 IDR
  • 09:00 09:30 30m 153000 IDR
  • 13:00 13:30 30m 153000 IDR
  • 15:00 15:30 30m 153000 IDR

Ferry Timetable: Sanur SGening → Sampalan Port, Nusa Penida

  • 08:00 08:45 45m 152000 IDR
  • 08:15 09:00 45m 152000 IDR

Ferry Timetable: Sanur Tanis → Nusa Penida Tanis

  • 07:30 08:00 30m 183333 IDR
  • 08:00 08:30 30m 183333 IDR
  • 09:00 09:30 30m 166667 IDR
  • 12:00 12:30 30m 183333 IDR
  • 13:30 14:00 30m 183333 IDR

Ferry Timetable: Sanur Wijaya Buyuk → Buyuk Harbor, Nusa Penida

  • 07:00 08:00 1h 200000 IDR
  • 08:00 09:00 1h 200000 IDR
  • 12:25 13:15 50m 200000 IDR
  • 12:30 13:20 50m 150000 IDR
  • 12:35 13:25 50m 150000 IDR

Ferry Timetable: Serangan Eka Jaya, Bali → Nusa Penida

  • 08:00 08:45 45m 307800 IDR

Ferry Timetable: Serangan Pier, Bali → Kutampi Beach, Nusa Penida

  • 08:00 09:00 1h 165000 IDR

Ferry Timetable: Waruna Darma Sanur Office → Waruna Darma Nusa Penida Office

  • 07:30 08:00 30m 152500 IDR
  • 09:00 09:30 30m 152500 IDR
  • 10:00 10:30 30m 152500 IDR
  • 13:30 14:00 30m 152500 IDR
  • 16:45 17:15 30m 152500 IDR

Check all Combined tickets →

Combined Routes & Schedules from Bali to Nusa Penida

For trips linking Bali and Nusa Penida, there are several points where you can start or end your journey. Depending on the stops selected, the trip usually lasts about 1h 5m to 6h. Services run from 00:01 until 17:00, with prices beginning at 160,000 to 1,250,000 IDR. Checking the full timetable for Bali and Nusa Penida provides an overview of all stops and departure options, making it easier to plan your itinerary.

Departure stations
Puja Mandala, Nusa Dua
Nirmala Supermarket Ungasan, Bali
Legian Transfer, Bali
Central Ubud Transfer
Tegalalang Transfer, Bali
Uluwatu Transfer, Bali
Canggu Transfer, Bali
Kuta Transfer, Bali
Seminyak Transfer
Nusa Dua Transfer, Bali
Sanur Transfer
Jimbaran Transfer, Bali
Jimbaran Hotel Transfer, Bali
Munggu Hotel Transfer, Canggu
Sanur Harbour
Ubud Central Transfer
Tegallalang Transfer, Ubud
Uluwatu Hotel Transfer, Bali
Uluwatu Temple
Nirmala Supermarket Pecatu
Nirmala Supermarket Jimbaran
Central Park Monkey Forest, Ubud
IKEA Bali Kuta
Benoa Square Jimbaran, Bali
Sunset Point Shopping Center Seminyak, Bali
Popular Market Deli Canggu
Serangan Hotel Transfer, Bali
Sidemen Transfer, Padang Bai
Kintamani Transfer
Pepito Market, Bali
Denpasar Transfer
Kerobokan Transfer, Bali
Mc Donald Restaurant, Jimbaran
Bedugul Transfer, Bali
Kuta Transfer
Munduk Transfer, Bali
Pererenan Transfer, Canggu
Lovina Transfer, Singaraja
Gangga Kusamba Port, Bali
Seminyak Hotel Transfer, Bali
Kuta Hotel Transfer, Bali
Legian Hotel Transfer, Bali
Nusa Dua Hotel Transfer, Bali
Pecatu Hotel Transfer, Bali
Coco Supermarket Ubud
Canggu Hotel Transfer, Bali
Sanur Hotel Transfer, Bali
Ubud Hotel Transfer, Bali
Cocomart Ubud
Arrival stations
Banjar Nyuh Pier, Nusa Penida
Nusa Penida
Banjar Nyuh Harbour, Nusa Penida
Nusa Penida Rayfish
Nusa Penida Pier
Banjar Nyuh Port, Nusa Penida
Nusa Penida Harbor
Sampalan Beach, Nusa Penida
Sampalan Port, Nusa Penida
Semaya One Nusa Penida
Sental Hotel Transfer, Nusa Penida
Pejukutan Hotel Transfer, Nusa Penida
Peguyangan Hotel Transfer, Nusa Penida
Kutampi Hotel Transfer, Nusa Penida
Karang Sari Hotel Transfer, Nusa Penida
Batu Nunggul Hotel Transfer, Nusa Penida
Batu Medag Hotel Transfer, Nusa Penida
Batu Kandik Hotel Transfer, Nusa Penida
Penida Harbour, Nusa Penida

Combined Timetable: Bedugul Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 09:30 14:30 5h 1125000 IDR

Combined Timetable: Bedugul Transfer, Bali → Sampalan Beach, Nusa Penida

  • 09:30 14:30 5h 1125000 IDR

Combined Timetable: Benoa Square Jimbaran, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:15 09:00 2h 45m 418750 IDR
  • 10:30 13:30 3h 418750 IDR
  • 13:30 16:30 3h 418750 IDR

Combined Timetable: Canggu Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 437500 IDR
  • 11:00 13:30 2h 30m 437500 IDR
  • 11:30 14:15 2h 45m 625000 IDR
  • 12:30 15:00 2h 30m 437500 IDR

Combined Timetable: Canggu Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:15 08:30 3h 15m 400000 IDR
  • 05:45 08:00 2h 15m 400000 IDR
  • 07:30 11:00 3h 30m 370000 IDR
  • 08:00 11:30 3h 30m 400000 IDR
  • 09:30 12:00 2h 30m 370000 IDR
  • 10:45 14:15 3h 30m 400000 IDR
  • 11:30 14:00 2h 30m 370000 IDR
  • 14:00 16:30 2h 30m 370000 IDR
  • 14:30 18:00 3h 30m 400000 IDR
  • 16:30 19:00 2h 30m 370000 IDR
  • 17:00 19:30 2h 30m 370000 IDR

Combined Timetable: Canggu Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:15 08:30 3h 15m 422500 IDR
  • 06:00 09:30 3h 30m 422500 IDR
  • 07:30 10:00 2h 30m 422500 IDR
  • 08:15 11:45 3h 30m 422500 IDR
  • 11:00 14:30 3h 30m 422500 IDR
  • 14:30 17:45 3h 15m 422500 IDR

Combined Timetable: Canggu Hotel Transfer, Bali → Nusa Penida Pier

  • 07:30 10:30 3h 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Canggu Hotel Transfer, Bali → Sampalan Port, Nusa Penida

  • 06:00 08:30 2h 30m 350000 IDR
  • 08:45 11:15 2h 30m 350000 IDR

Combined Timetable: Canggu Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 290380 IDR

Combined Timetable: Canggu Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 290380 IDR

Combined Timetable: Canggu Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Canggu Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Central Park Monkey Forest, Ubud → Banjar Nyuh Pier, Nusa Penida

  • 05:30 07:45 2h 15m 285000 IDR
  • 07:00 09:15 2h 15m 285000 IDR
  • 07:30 09:45 2h 15m 285000 IDR
  • 08:00 10:15 2h 15m 285000 IDR
  • 11:00 13:15 2h 15m 285000 IDR
  • 11:30 13:45 2h 15m 285000 IDR
  • 14:00 16:15 2h 15m 285000 IDR

Combined Timetable: Central Ubud Transfer → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 277750 IDR

Combined Timetable: Central Ubud Transfer → Nusa Penida

  • 09:30 12:15 2h 45m 290380 IDR

Combined Timetable: Central Ubud Transfer → Nusa Penida Pier

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Central Ubud Transfer → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Coco Supermarket Ubud → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 418750 IDR
  • 07:00 09:30 2h 30m 468750 IDR
  • 11:00 13:30 2h 30m 418750 IDR
  • 14:00 16:30 2h 30m 418750 IDR

Combined Timetable: Coco Supermarket Ubud → Banjar Nyuh Pier, Nusa Penida

  • 06:15 08:15 2h 285000 IDR
  • 06:30 08:30 2h 285000 IDR
  • 07:00 09:00 2h 285000 IDR
  • 08:00 10:00 2h 285000 IDR
  • 11:00 13:00 2h 285000 IDR
  • 12:30 14:30 2h 285000 IDR
  • 14:00 16:00 2h 285000 IDR

Combined Timetable: Coco Supermarket Ubud → Banjar Nyuh Port, Nusa Penida

  • 05:30 07:30 2h 224000 IDR
  • 06:30 08:30 2h 224000 IDR
  • 06:45 08:45 2h 224000 IDR
  • 07:00 09:00 2h 224000 IDR
  • 07:30 09:30 2h 224000 IDR
  • 09:30 11:30 2h 224000 IDR
  • 11:00 13:00 2h 224000 IDR
  • 11:30 13:30 2h 224000 IDR
  • 12:00 14:00 2h 224000 IDR
  • 12:30 14:30 2h 224000 IDR
  • 14:30 16:30 2h 224000 IDR

Combined Timetable: Coco Supermarket Ubud → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Coco Supermarket Ubud → Penida Harbour, Nusa Penida

  • 05:30 08:10 2h 40m 285000 IDR
  • 06:00 08:40 2h 40m 285000 IDR
  • 06:30 09:10 2h 40m 285000 IDR
  • 06:45 09:25 2h 40m 285000 IDR
  • 07:00 09:40 2h 40m 285000 IDR
  • 07:30 10:10 2h 40m 285000 IDR
  • 08:00 10:40 2h 40m 285000 IDR
  • 09:30 12:10 2h 40m 285000 IDR
  • 11:00 13:40 2h 40m 285000 IDR
  • 11:30 14:10 2h 40m 285000 IDR
  • 12:00 14:40 2h 40m 285000 IDR
  • 12:30 15:10 2h 40m 285000 IDR
  • 14:30 17:10 2h 40m 285000 IDR

Combined Timetable: Cocomart Ubud → Banjar Nyuh Port, Nusa Penida

  • 07:30 10:00 2h 30m 383500 IDR

Combined Timetable: Denpasar Transfer → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Denpasar Transfer → Sampalan Port, Nusa Penida

  • 06:30 08:30 2h 300000 IDR
  • 09:15 11:15 2h 300000 IDR

Combined Timetable: Gangga Kusamba Port, Bali → Semaya One Nusa Penida

  • 06:30 06:50 20m 175000 IDR
  • 07:00 07:20 20m 175000 IDR
  • 08:00 08:20 20m 175000 IDR
  • 09:00 09:20 20m 175000 IDR
  • 10:30 10:50 20m 175000 IDR
  • 12:30 12:50 20m 175000 IDR
  • 14:00 14:20 20m 175000 IDR
  • 15:45 16:05 20m 175000 IDR
  • 17:00 17:20 20m 175000 IDR

Combined Timetable: IKEA Bali Kuta → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 418750 IDR
  • 10:30 13:30 3h 418750 IDR
  • 13:30 16:30 3h 418750 IDR

Combined Timetable: Jimbaran Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 468750 IDR
  • 11:00 13:30 2h 30m 468750 IDR
  • 12:00 14:15 2h 15m 625000 IDR
  • 12:30 15:00 2h 30m 468750 IDR

Combined Timetable: Jimbaran Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 380000 IDR
  • 05:45 08:00 2h 15m 380000 IDR
  • 08:00 11:00 3h 380000 IDR
  • 08:15 11:30 3h 15m 380000 IDR
  • 11:00 14:15 3h 15m 380000 IDR
  • 15:00 18:00 3h 380000 IDR

Combined Timetable: Jimbaran Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 396500 IDR
  • 06:00 09:30 3h 30m 396500 IDR
  • 07:30 10:00 2h 30m 396500 IDR
  • 08:15 11:45 3h 30m 396500 IDR
  • 11:00 14:30 3h 30m 396500 IDR
  • 11:30 14:15 2h 45m 396500 IDR
  • 15:00 17:45 2h 45m 396500 IDR

Combined Timetable: Jimbaran Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 384750 IDR
  • 06:30 09:00 2h 30m 384750 IDR
  • 07:30 10:00 2h 30m 384750 IDR
  • 08:00 10:30 2h 30m 384750 IDR
  • 10:45 13:15 2h 30m 384750 IDR
  • 11:15 13:45 2h 30m 384750 IDR
  • 14:30 17:00 2h 30m 384750 IDR

Combined Timetable: Jimbaran Hotel Transfer, Bali → Nusa Penida Pier

  • 07:00 10:30 3h 30m 225000 IDR
  • 12:00 15:30 3h 30m 225000 IDR
  • 14:00 17:30 3h 30m 225000 IDR

Combined Timetable: Jimbaran Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Jimbaran Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Jimbaran Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Jimbaran Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Kerobokan Transfer, Bali → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Kintamani Transfer → Banjar Nyuh Harbour, Nusa Penida

  • 05:30 09:00 3h 30m 687500 IDR
  • 10:00 13:30 3h 30m 687500 IDR
  • 11:30 15:00 3h 30m 687500 IDR

Combined Timetable: Kuta Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:45 09:00 2h 15m 437500 IDR
  • 11:15 13:30 2h 15m 437500 IDR
  • 12:30 14:15 1h 45m 625000 IDR
  • 12:45 15:00 2h 15m 437500 IDR

Combined Timetable: Kuta Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 370000 IDR
  • 05:45 08:00 2h 15m 370000 IDR
  • 08:15 11:30 3h 15m 370000 IDR
  • 08:30 11:00 2h 30m 370000 IDR
  • 08:45 11:30 2h 45m 370000 IDR
  • 11:30 14:15 2h 45m 370000 IDR
  • 15:15 18:00 2h 45m 370000 IDR

Combined Timetable: Kuta Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 383500 IDR
  • 06:30 09:30 3h 383500 IDR
  • 07:30 10:00 2h 30m 383500 IDR
  • 08:45 11:45 3h 383500 IDR
  • 11:30 14:30 3h 383500 IDR
  • 11:45 14:15 2h 30m 383500 IDR
  • 15:15 17:45 2h 30m 383500 IDR

Combined Timetable: Kuta Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 337500 IDR
  • 06:30 09:00 2h 30m 337500 IDR
  • 07:30 10:00 2h 30m 337500 IDR
  • 08:00 10:30 2h 30m 337500 IDR
  • 10:45 13:15 2h 30m 337500 IDR
  • 11:15 13:45 2h 30m 337500 IDR
  • 14:30 17:00 2h 30m 337500 IDR

Combined Timetable: Kuta Hotel Transfer, Bali → Nusa Penida Pier

  • 07:30 10:30 3h 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Kuta Transfer → Banjar Nyuh Port, Nusa Penida

  • 06:00 08:25 2h 25m 275000 IDR
  • 06:15 09:45 3h 30m 235000 IDR

Combined Timetable: Kuta Transfer → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Kuta Transfer → Sampalan Port, Nusa Penida

  • 06:30 08:30 2h 300000 IDR
  • 09:15 11:15 2h 300000 IDR

Combined Timetable: Kuta Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Kuta Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Kuta Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Kuta Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 370000 IDR
  • 05:45 08:00 2h 15m 370000 IDR
  • 08:15 11:30 3h 15m 370000 IDR
  • 08:30 11:00 2h 30m 370000 IDR
  • 08:45 11:30 2h 45m 370000 IDR
  • 11:30 14:15 2h 45m 370000 IDR
  • 15:15 18:00 2h 45m 370000 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 383500 IDR
  • 06:00 08:25 2h 25m 275000 IDR
  • 06:30 09:30 3h 383500 IDR
  • 07:30 10:00 2h 30m 383500 IDR
  • 08:45 11:45 3h 383500 IDR
  • 11:30 14:30 3h 383500 IDR
  • 11:45 14:15 2h 30m 383500 IDR
  • 15:15 17:45 2h 30m 383500 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 337500 IDR
  • 06:30 09:00 2h 30m 337500 IDR
  • 07:30 10:00 2h 30m 337500 IDR
  • 08:00 10:30 2h 30m 337500 IDR
  • 10:45 13:15 2h 30m 337500 IDR
  • 11:15 13:45 2h 30m 337500 IDR
  • 14:30 17:00 2h 30m 337500 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Nusa Penida Pier

  • 07:30 10:30 3h 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Legian Hotel Transfer, Bali → Sampalan Port, Nusa Penida

  • 06:30 08:30 2h 300000 IDR
  • 09:15 11:15 2h 300000 IDR

Combined Timetable: Legian Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Legian Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Legian Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Legian Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Lovina Transfer, Singaraja → Banjar Nyuh Harbour, Nusa Penida

  • 08:30 14:30 6h 1250000 IDR

Combined Timetable: Lovina Transfer, Singaraja → Sampalan Beach, Nusa Penida

  • 08:30 14:30 6h 1250000 IDR

Combined Timetable: Mc Donald Restaurant, Jimbaran → Banjar Nyuh Port, Nusa Penida

  • 06:00 09:45 3h 45m 260000 IDR

Combined Timetable: Mc Donald Restaurant, Jimbaran → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Mc Donald Restaurant, Jimbaran → Sampalan Port, Nusa Penida

  • 06:00 08:30 2h 30m 350000 IDR
  • 08:45 11:15 2h 30m 350000 IDR

Combined Timetable: Munduk Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 09:00 14:30 5h 30m 1125000 IDR

Combined Timetable: Munduk Transfer, Bali → Sampalan Beach, Nusa Penida

  • 09:00 14:30 5h 30m 1125000 IDR

Combined Timetable: Munggu Hotel Transfer, Canggu → Banjar Nyuh Pier, Nusa Penida

  • 05:15 08:30 3h 15m 400000 IDR
  • 05:45 08:00 2h 15m 400000 IDR
  • 07:30 11:00 3h 30m 400000 IDR
  • 08:00 11:30 3h 30m 400000 IDR
  • 10:45 14:15 3h 30m 400000 IDR
  • 14:30 18:00 3h 30m 400000 IDR

Combined Timetable: Munggu Hotel Transfer, Canggu → Banjar Nyuh Port, Nusa Penida

  • 05:15 08:30 3h 15m 422500 IDR
  • 06:00 09:30 3h 30m 422500 IDR
  • 07:30 10:00 2h 30m 422500 IDR
  • 08:15 11:45 3h 30m 422500 IDR
  • 11:00 14:30 3h 30m 422500 IDR
  • 14:30 17:45 3h 15m 422500 IDR

Combined Timetable: Nirmala Supermarket Jimbaran → Banjar Nyuh Pier, Nusa Penida

  • 05:30 06:35 1h 5m 375000 IDR
  • 07:30 08:35 1h 5m 375000 IDR
  • 08:00 09:05 1h 5m 375000 IDR
  • 11:00 12:05 1h 5m 375000 IDR
  • 11:30 12:35 1h 5m 375000 IDR
  • 14:00 15:05 1h 5m 375000 IDR

Combined Timetable: Nirmala Supermarket Pecatu → Banjar Nyuh Pier, Nusa Penida

  • 05:30 07:45 1h 15m 375000 IDR
  • 07:30 09:45 1h 15m 375000 IDR
  • 08:00 10:15 1h 15m 375000 IDR
  • 11:00 13:15 1h 15m 375000 IDR
  • 11:30 13:45 1h 15m 375000 IDR
  • 14:00 16:15 1h 15m 375000 IDR

Combined Timetable: Nirmala Supermarket Ungasan, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 06:41 1h 11m 375000 IDR
  • 07:30 08:41 1h 11m 375000 IDR
  • 08:00 09:11 1h 11m 375000 IDR
  • 11:00 12:11 1h 11m 375000 IDR
  • 11:30 12:41 1h 11m 375000 IDR
  • 14:00 15:11 1h 11m 375000 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 468750 IDR
  • 11:00 13:30 2h 30m 468750 IDR
  • 12:30 15:00 2h 30m 468750 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 380000 IDR
  • 05:45 08:00 2h 15m 380000 IDR
  • 08:00 11:00 3h 380000 IDR
  • 08:15 11:30 3h 15m 380000 IDR
  • 11:00 14:15 3h 15m 380000 IDR
  • 15:00 18:00 3h 380000 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 396500 IDR
  • 06:00 09:30 3h 30m 396500 IDR
  • 07:30 10:00 2h 30m 396500 IDR
  • 08:15 11:45 3h 30m 396500 IDR
  • 11:00 14:30 3h 30m 396500 IDR
  • 11:30 14:15 2h 45m 396500 IDR
  • 15:00 17:45 2h 45m 396500 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 384750 IDR
  • 06:30 09:00 2h 30m 384750 IDR
  • 07:30 10:00 2h 30m 384750 IDR
  • 08:00 10:30 2h 30m 384750 IDR
  • 10:45 13:15 2h 30m 384750 IDR
  • 11:15 13:45 2h 30m 384750 IDR
  • 14:30 17:00 2h 30m 384750 IDR

Combined Timetable: Nusa Dua Hotel Transfer, Bali → Nusa Penida Pier

  • 07:00 10:30 3h 30m 225000 IDR
  • 07:30 10:30 3h 225000 IDR
  • 12:00 15:30 3h 30m 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:00 17:30 3h 30m 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Nusa Dua Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Nusa Dua Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Nusa Dua Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Nusa Dua Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Pecatu Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:00 09:00 3h 500000 IDR
  • 10:30 13:30 3h 500000 IDR
  • 11:30 14:15 2h 45m 625000 IDR
  • 12:00 15:00 3h 500000 IDR

Combined Timetable: Pecatu Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:15 08:30 3h 15m 390000 IDR
  • 05:30 06:54 1h 24m 375000 IDR
  • 05:45 08:00 2h 15m 390000 IDR
  • 07:30 11:00 3h 30m 375000 IDR
  • 08:00 09:24 1h 24m 390000 IDR
  • 10:45 14:15 3h 30m 390000 IDR
  • 11:00 12:24 1h 24m 375000 IDR
  • 11:30 12:54 1h 24m 375000 IDR
  • 14:00 15:24 1h 24m 375000 IDR
  • 14:30 18:00 3h 30m 390000 IDR

Combined Timetable: Pecatu Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:15 08:30 3h 15m 409500 IDR
  • 05:45 09:30 3h 45m 409500 IDR
  • 06:00 09:45 3h 45m 310000 IDR
  • 07:30 10:00 2h 30m 409500 IDR
  • 08:00 11:45 3h 45m 409500 IDR
  • 10:45 14:30 3h 45m 409500 IDR
  • 11:00 14:15 3h 15m 409500 IDR
  • 14:30 17:45 3h 15m 409500 IDR

Combined Timetable: Pecatu Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 384750 IDR
  • 06:30 09:00 2h 30m 384750 IDR
  • 07:30 10:00 2h 30m 384750 IDR
  • 08:00 10:30 2h 30m 384750 IDR
  • 10:45 13:15 2h 30m 384750 IDR
  • 11:15 13:45 2h 30m 384750 IDR
  • 14:30 17:00 2h 30m 384750 IDR

Combined Timetable: Pecatu Hotel Transfer, Bali → Nusa Penida Pier

  • 07:00 10:30 3h 30m 225000 IDR
  • 12:00 15:30 3h 30m 225000 IDR
  • 14:00 17:30 3h 30m 225000 IDR

Combined Timetable: Pepito Market, Bali → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Pererenan Transfer, Canggu → Sampalan Port, Nusa Penida

  • 06:00 08:30 2h 30m 350000 IDR
  • 08:45 11:15 2h 30m 350000 IDR

Combined Timetable: Popular Market Deli Canggu → Banjar Nyuh Harbour, Nusa Penida

  • 06:00 09:00 3h 418750 IDR
  • 10:30 13:30 3h 418750 IDR
  • 13:30 16:30 3h 418750 IDR

Combined Timetable: Puja Mandala, Nusa Dua → Banjar Nyuh Pier, Nusa Penida

  • 05:30 07:29 59m 375000 IDR
  • 07:30 09:29 59m 375000 IDR
  • 08:00 09:59 59m 375000 IDR
  • 11:00 12:59 59m 375000 IDR
  • 11:30 13:29 59m 375000 IDR
  • 14:00 15:59 59m 375000 IDR

Combined Timetable: Sanur Harbour → Banjar Nyuh Port, Nusa Penida

  • 07:00 07:30 30m 176500 IDR
  • 07:30 08:00 30m 176500 IDR
  • 08:00 08:25 25m 160000 IDR
  • 08:30 08:55 25m 160000 IDR
  • 09:00 09:25 25m 160000 IDR
  • 10:30 11:00 30m 176500 IDR
  • 11:00 11:25 25m 160000 IDR
  • 13:00 13:30 30m 176500 IDR
  • 15:30 16:00 30m 176500 IDR

Combined Timetable: Sanur Harbour → Batu Kandik Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 625000 IDR
  • 08:30 11:00 2h 30m 625000 IDR
  • 10:00 12:30 2h 30m 625000 IDR
  • 10:30 13:00 2h 30m 625000 IDR
  • 13:00 15:30 2h 30m 625000 IDR
  • 14:00 16:30 2h 30m 625000 IDR
  • 15:00 17:30 2h 30m 625000 IDR
  • 17:00 19:30 2h 30m 625000 IDR

Combined Timetable: Sanur Harbour → Batu Medag Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 775000 IDR
  • 08:30 11:00 2h 30m 775000 IDR
  • 10:00 12:30 2h 30m 775000 IDR
  • 10:30 13:00 2h 30m 775000 IDR
  • 13:00 15:30 2h 30m 775000 IDR
  • 14:00 16:30 2h 30m 775000 IDR
  • 15:00 17:30 2h 30m 775000 IDR
  • 17:00 19:30 2h 30m 775000 IDR

Combined Timetable: Sanur Harbour → Batu Nunggul Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 565000 IDR
  • 08:30 11:00 2h 30m 565000 IDR
  • 10:00 12:30 2h 30m 565000 IDR
  • 10:30 13:00 2h 30m 565000 IDR
  • 13:00 15:30 2h 30m 565000 IDR
  • 14:00 16:30 2h 30m 565000 IDR
  • 15:00 17:30 2h 30m 565000 IDR
  • 17:00 19:30 2h 30m 565000 IDR

Combined Timetable: Sanur Harbour → Karang Sari Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 675000 IDR
  • 08:30 11:00 2h 30m 675000 IDR
  • 10:00 12:30 2h 30m 675000 IDR
  • 10:30 13:00 2h 30m 675000 IDR
  • 13:00 15:30 2h 30m 675000 IDR
  • 14:00 16:30 2h 30m 675000 IDR
  • 15:00 17:30 2h 30m 675000 IDR
  • 17:00 19:30 2h 30m 675000 IDR

Combined Timetable: Sanur Harbour → Kutampi Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 572500 IDR
  • 08:30 11:00 2h 30m 572500 IDR
  • 10:00 12:30 2h 30m 572500 IDR
  • 10:30 13:00 2h 30m 572500 IDR
  • 13:00 15:30 2h 30m 572500 IDR
  • 14:00 16:30 2h 30m 572500 IDR
  • 15:00 17:30 2h 30m 572500 IDR
  • 17:00 19:30 2h 30m 572500 IDR

Combined Timetable: Sanur Harbour → Nusa Penida

  • 06:30 09:30 3h 300000 IDR
  • 12:00 15:00 3h 300000 IDR

Combined Timetable: Sanur Harbour → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 283500 IDR
  • 06:30 09:00 2h 30m 283500 IDR
  • 07:30 10:00 2h 30m 283500 IDR
  • 08:00 10:30 2h 30m 283500 IDR
  • 10:45 13:15 2h 30m 283500 IDR
  • 11:15 13:45 2h 30m 283500 IDR
  • 14:30 17:00 2h 30m 283500 IDR

Combined Timetable: Sanur Harbour → Peguyangan Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 775000 IDR
  • 08:30 11:00 2h 30m 775000 IDR
  • 10:00 12:30 2h 30m 775000 IDR
  • 10:30 13:00 2h 30m 775000 IDR
  • 13:00 15:30 2h 30m 775000 IDR
  • 14:00 16:30 2h 30m 775000 IDR
  • 15:00 17:30 2h 30m 775000 IDR
  • 17:00 19:30 2h 30m 775000 IDR

Combined Timetable: Sanur Harbour → Pejukutan Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 775000 IDR
  • 08:30 11:00 2h 30m 775000 IDR
  • 10:00 12:30 2h 30m 775000 IDR
  • 10:30 13:00 2h 30m 775000 IDR
  • 13:00 15:30 2h 30m 775000 IDR
  • 14:00 16:30 2h 30m 775000 IDR
  • 15:00 17:30 2h 30m 775000 IDR
  • 17:00 19:30 2h 30m 775000 IDR

Combined Timetable: Sanur Harbour → Sental Hotel Transfer, Nusa Penida

  • 07:30 10:00 2h 30m 475000 IDR
  • 08:30 11:00 2h 30m 475000 IDR
  • 10:00 12:30 2h 30m 475000 IDR
  • 10:30 13:00 2h 30m 475000 IDR
  • 13:00 15:30 2h 30m 475000 IDR
  • 14:00 16:30 2h 30m 475000 IDR
  • 15:00 17:30 2h 30m 475000 IDR
  • 17:00 19:30 2h 30m 475000 IDR

Combined Timetable: Sanur Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 06:00 08:25 2h 25m 275000 IDR
  • 06:45 09:45 3h 235000 IDR

Combined Timetable: Sanur Hotel Transfer, Bali → Nusa Penida

  • 07:00 08:45 1h 45m 250000 IDR
  • 11:00 12:45 1h 45m 250000 IDR

Combined Timetable: Sanur Hotel Transfer, Bali → Sampalan Port, Nusa Penida

  • 06:30 08:30 2h 300000 IDR
  • 09:15 11:15 2h 300000 IDR

Combined Timetable: Sanur Transfer → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Sanur Transfer → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Sanur Transfer → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Sanur Transfer → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 437500 IDR
  • 11:00 13:30 2h 30m 437500 IDR
  • 12:30 15:00 2h 30m 437500 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 370000 IDR
  • 05:45 08:00 2h 15m 370000 IDR
  • 08:15 11:30 3h 15m 370000 IDR
  • 08:30 11:00 2h 30m 370000 IDR
  • 08:45 11:30 2h 45m 370000 IDR
  • 11:30 14:15 2h 45m 370000 IDR
  • 15:15 18:00 2h 45m 370000 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 383500 IDR
  • 06:00 08:25 2h 25m 275000 IDR
  • 06:30 09:30 3h 383500 IDR
  • 06:45 09:45 3h 235000 IDR
  • 07:30 10:00 2h 30m 383500 IDR
  • 08:45 11:45 3h 383500 IDR
  • 11:30 14:30 3h 383500 IDR
  • 11:45 14:15 2h 30m 383500 IDR
  • 15:15 17:45 2h 30m 383500 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Nusa Penida

  • 06:30 08:45 2h 15m 250000 IDR
  • 10:00 12:45 2h 45m 250000 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 337500 IDR
  • 06:30 09:00 2h 30m 337500 IDR
  • 07:30 10:00 2h 30m 337500 IDR
  • 08:00 10:30 2h 30m 337500 IDR
  • 10:45 13:15 2h 30m 337500 IDR
  • 11:15 13:45 2h 30m 337500 IDR
  • 14:30 17:00 2h 30m 337500 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Nusa Penida Pier

  • 07:30 10:30 3h 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Seminyak Hotel Transfer, Bali → Sampalan Port, Nusa Penida

  • 06:30 08:30 2h 300000 IDR
  • 09:15 11:15 2h 300000 IDR

Combined Timetable: Seminyak Transfer → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 227249 IDR

Combined Timetable: Seminyak Transfer → Nusa Penida

  • 09:30 12:15 2h 45m 239880 IDR

Combined Timetable: Seminyak Transfer → Nusa Penida Pier

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Seminyak Transfer → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 239880 IDR

Combined Timetable: Serangan Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 12:30 14:15 1h 45m 625000 IDR

Combined Timetable: Sidemen Transfer, Padang Bai → Banjar Nyuh Harbour, Nusa Penida

  • 06:00 09:00 3h 625000 IDR
  • 10:30 13:30 3h 625000 IDR
  • 12:00 15:00 3h 625000 IDR

Combined Timetable: Sunset Point Shopping Center Seminyak, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:00 2h 30m 418750 IDR
  • 10:30 13:30 3h 418750 IDR
  • 13:30 16:30 3h 418750 IDR

Combined Timetable: Tegalalang Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:15 2h 45m 277750 IDR

Combined Timetable: Tegalalang Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 290380 IDR

Combined Timetable: Tegalalang Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Tegalalang Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Tegallalang Transfer, Ubud → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:30 3h 562500 IDR

Combined Timetable: Tegallalang Transfer, Ubud → Banjar Nyuh Pier, Nusa Penida

  • 05:00 08:30 3h 30m 400000 IDR
  • 05:45 08:00 2h 15m 400000 IDR
  • 07:30 11:00 3h 30m 400000 IDR
  • 08:00 11:30 3h 30m 400000 IDR
  • 10:45 14:15 3h 30m 400000 IDR
  • 14:30 18:00 3h 30m 400000 IDR

Combined Timetable: Tegallalang Transfer, Ubud → Banjar Nyuh Port, Nusa Penida

  • 05:00 08:30 3h 30m 422500 IDR
  • 05:45 09:30 3h 45m 422500 IDR
  • 07:30 10:00 2h 30m 422500 IDR
  • 08:00 11:45 3h 45m 422500 IDR
  • 10:45 14:30 3h 45m 422500 IDR
  • 11:00 14:15 3h 15m 422500 IDR
  • 14:30 17:45 3h 15m 422500 IDR

Combined Timetable: Ubud Central Transfer → Banjar Nyuh Pier, Nusa Penida

  • 05:30 08:30 3h 370000 IDR
  • 05:45 08:00 2h 15m 370000 IDR
  • 08:15 11:30 3h 15m 370000 IDR
  • 08:30 11:00 2h 30m 370000 IDR
  • 08:45 11:30 2h 45m 370000 IDR
  • 11:30 14:15 2h 45m 370000 IDR
  • 15:00 18:00 3h 370000 IDR

Combined Timetable: Ubud Central Transfer → Banjar Nyuh Port, Nusa Penida

  • 05:30 08:30 3h 383500 IDR
  • 06:30 09:30 3h 383500 IDR
  • 07:30 10:00 2h 30m 383500 IDR
  • 08:45 11:45 3h 383500 IDR
  • 11:30 14:30 3h 383500 IDR
  • 11:45 14:15 2h 30m 383500 IDR
  • 15:15 17:45 2h 30m 383500 IDR

Combined Timetable: Ubud Central Transfer → Nusa Penida Pier

  • 07:30 10:30 3h 225000 IDR
  • 12:30 15:30 3h 225000 IDR
  • 14:30 17:30 3h 225000 IDR

Combined Timetable: Ubud Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:30 09:30 3h 437500 IDR
  • 07:00 09:30 2h 30m 512500 IDR
  • 10:00 13:00 3h 437500 IDR
  • 14:30 17:30 3h 437500 IDR

Combined Timetable: Uluwatu Hotel Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 06:00 09:00 3h 500000 IDR
  • 10:30 13:30 3h 500000 IDR
  • 12:00 15:00 3h 500000 IDR

Combined Timetable: Uluwatu Hotel Transfer, Bali → Banjar Nyuh Pier, Nusa Penida

  • 05:15 08:30 3h 15m 390000 IDR
  • 05:45 08:00 2h 15m 390000 IDR
  • 07:30 11:00 3h 30m 390000 IDR
  • 08:00 11:30 3h 30m 390000 IDR
  • 10:45 14:15 3h 30m 390000 IDR
  • 14:30 18:00 3h 30m 390000 IDR

Combined Timetable: Uluwatu Hotel Transfer, Bali → Banjar Nyuh Port, Nusa Penida

  • 05:15 08:30 3h 15m 409500 IDR
  • 05:45 09:30 3h 45m 409500 IDR
  • 06:00 09:45 3h 45m 310000 IDR
  • 07:30 10:00 2h 30m 409500 IDR
  • 08:00 11:45 3h 45m 409500 IDR
  • 10:45 14:30 3h 45m 409500 IDR
  • 11:00 14:15 3h 15m 409500 IDR
  • 14:30 17:45 3h 15m 409500 IDR

Combined Timetable: Uluwatu Hotel Transfer, Bali → Nusa Penida Harbor

  • 05:30 08:00 2h 30m 384750 IDR
  • 06:30 09:00 2h 30m 384750 IDR
  • 07:30 10:00 2h 30m 384750 IDR
  • 08:00 10:30 2h 30m 384750 IDR
  • 10:45 13:15 2h 30m 384750 IDR
  • 11:15 13:45 2h 30m 384750 IDR
  • 14:30 17:00 2h 30m 384750 IDR

Combined Timetable: Uluwatu Hotel Transfer, Bali → Nusa Penida Pier

  • 07:00 10:30 3h 30m 225000 IDR
  • 12:00 15:30 3h 30m 225000 IDR
  • 14:00 17:30 3h 30m 225000 IDR

Combined Timetable: Uluwatu Temple → Banjar Nyuh Pier, Nusa Penida

  • 05:30 06:55 1h 25m 375000 IDR
  • 07:30 08:55 1h 25m 375000 IDR
  • 08:00 09:25 1h 25m 375000 IDR
  • 11:00 12:25 1h 25m 375000 IDR
  • 11:30 12:55 1h 25m 375000 IDR
  • 14:00 15:25 1h 25m 375000 IDR

Combined Timetable: Uluwatu Transfer, Bali → Banjar Nyuh Harbour, Nusa Penida

  • 00:01 02:46 2h 45m 625000 IDR
  • 06:30 09:15 2h 45m 277750 IDR

Combined Timetable: Uluwatu Transfer, Bali → Nusa Penida

  • 09:30 12:15 2h 45m 290380 IDR

Combined Timetable: Uluwatu Transfer, Bali → Nusa Penida Pier

  • 06:00 09:15 3h 15m 290380 IDR

Combined Timetable: Uluwatu Transfer, Bali → Nusa Penida Rayfish

  • 06:00 09:15 3h 15m 290380 IDR

Check all Combined tickets →

Frequently Asked Questions Bali to Nusa Penida

Below you will find answers to the most common questions about traveling from Bali to Nusa Penida.

How long does the Bali to Nusa Penida route usually take?

Travel time on the Bali to Nusa Penida route ranges from about 1 hour 5 minutes to 6 hours, depending on the service and departure point. Ferry trips are generally about 1 to 2 hours, while combined transfer services can take much longer.

What is the price range for traveling from Bali to Nusa Penida?

The Bali to Nusa Penida route costs between IDR 47,196 and IDR 1,250,000 across the available services. Ferry fares are lower, while combined transfer options cover a much wider price range.

Which is the cheapest way to get from Bali to Nusa Penida?

The cheapest available option on the Bali to Nusa Penida route is a ferry service, with fares starting at IDR 47,196. That is below the combined transfer options, which start at IDR 160,000.

What is the fastest option for the Bali to Nusa Penida trip?

The fastest listed trip on the Bali to Nusa Penida route is 65 minutes, for example from Nirmala Supermarket Jimbaran to Banjar Nyuh Pier. Ferry services can also take about 60 minutes on some departures, depending on the operator and port.

Where do trips from Bali to Nusa Penida usually depart and arrive?

Departures from Bali include Sanur Harbour, Serangan Pier, Padang Bai, Kusamba Port, and many hotel or transfer points such as Kuta, Ubud, and Canggu. Arrivals in Nusa Penida include Banjar Nyuh Pier, Sampalan Port, Nusa Penida Harbor, and other operator-specific drop-off points.

How often do Bali to Nusa Penida services run, and what are the first and last departures?

The context does not list a fixed frequency for Bali to Nusa Penida services. The first departure shown is 00:01 for combined services, and the last departure is 17:00. Ferry services run from 06:30 to 17:00.

Are ferry trips from Bali to Nusa Penida different from the combined transfer options?

Yes. Ferry services from Bali to Nusa Penida cost IDR 47,196 to IDR 307,800 and usually take about 1 to 2 hours. Combined transfer options cost IDR 160,000 to IDR 1,250,000 and can take about 1 hour 5 minutes to 6 hours.

If I leave from Sanur on the Bali to Nusa Penida route, what should I expect?

Sanur is a major departure area for both ferry and combined services on the Bali to Nusa Penida route. Ferry departures from Sanur can take about 1 hour or 2 hours depending on the operator, while some combined services from Sanur take about 2 hours 45 minutes.

How long does the Bali to Nusa Penida trip take from Ubud or central Bali?

From Ubud-area points such as Central Ubud Transfer or Tegalalang Transfer, combined services to Nusa Penida are listed at about 2 hours 45 minutes. Some Ubud departures to Banjar Nyuh Pier are shorter or longer depending on the exact pickup and drop-off point.

What is the travel time from Bali's southern areas like Kuta, Seminyak, or Canggu to Nusa Penida?

From Kuta, Seminyak, Canggu, and nearby southern Bali points, combined services to Nusa Penida are commonly listed at about 2 hours 45 minutes. Some specific hotel or pier combinations are shorter, around 1 hour 45 minutes to 2 hours 30 minutes.

Can I book the Bali to Nusa Penida route online in one place?

Yes. For booking the Bali to Nusa Penida route, use TicketRoutes.com. It lists the available services, departure points, and fares in one place, which makes it easier to compare options before booking.

Are there any Bali to Nusa Penida services that go to specific ports like Banjar Nyuh or Sampalan?

Yes. The route includes services to Banjar Nyuh Pier, Banjar Nyuh Harbour, Sampalan Port, and Nusa Penida Harbor. Ferry and combined services both use these arrival points, but the exact destination depends on the operator and departure point.

Discover Indonesia through its transport connections

Route finder

Explore how destinations across the country are linked by rail, road, sea, and air. Use the interactive map to compare routes and plan future trips with ease.


More travel routes for Bali and Nusa Penida

Planning more stops after Bali to Nusa Penida?

If your journey doesn’t end with Bali to Nusa Penida, use the TicketRoutes Travel Planner to build a complete multi-city itinerary. Compare buses, trains, ferries, and flights for several destinations at once — faster and easier.

Try the Travel Planner

Perfect for travelers visiting multiple cities on one trip.